2016-2020_Financial_Plan_Web
Engineering
Create AMANDA Engineering building permit review process module to ensure Engineering requirements are completed before building and/or occupancy permits are issued; Develop new City Policy that every contractor working on City roads or statutory rights-of-ways must be certified through a safety training program; Increase Engineering-Operations overall efficiency by 25% over the next 5 years; Reduce outside employees preventable accidents by 90% in the next 4 years (with 2014 being the base year); ENVIRONMENTAL Secure a location within the Newton or City Centre area to host a regional Residential Drop-off Eco-centre Facility; Complete the purchase of the 143 acre Tree Seed Centre in Campbell Heights, for park purposes; Participate in ongoing environmental stewardship by overseeing and managing the P-15 Habitat Replacement process; Expand EV fleet through attrition and where it makes economic sense to do so; SOCIO-CULTURAL Implement, with the assistance of Transportation Planning, the Utilities Division, and the Design & Construction Division, an overall strategic three-year plan for the delivery of the annual Capital Works Program;
Complete final phase of the City’s Main Operations Centre project; Commence construction of the South Surrey Operations Facility located in the Grandview Heights community; Implement a suitable framework for Key Performance Indicators; Establish a second capital construction crew that will help reduce the impact of costs for capital projects; Streamline our water tie-in operations utilizing hydro excavation wherever practical and cost effective; and Implement an in-house Crack Sealing Operation to cost effectively increase the life of our road surfaces.
Reduce illegal dumping and associated costs by 50% over the next
3 years (Year 2 of 3). Stage 2: Implement multifaceted public
education campaign; Explore pilot “small RDO” facility in South Surrey; Reduce Fleet emissions by 20% by the year 2020; Establish CNG fuelling for R&D North at FortisBC facility (168 Street at Fraser Highway); and Establish Stokes Pit Materials Processing.
Secure a 2016/2017 lease renewal for the continued operation of the Winter Shelter in the City Centre;
2016-2020 FINANCIAL PLAN
181
Made with FlippingBook