2018 - 2022 Financial Plan Online Interactive

WATER

HEALTH & WELLNESS

 Continue to investigate the chlorine residual in our water distribution

 Continue to protect the City’s water quality by conducting cross connection control surveys at 300 industrial, commercial and institutionally zones properties each year.

system and develop a plan to implement any remedial action necessary;

 Achieve over 95% compliance of the annual testing of backflow preventers; and

INFRASTRUCTURE

 Support Metro Vancouver with their delivery of the Annacis No. 5 river crossing, Kennedy Newton water main, Fleetwood Reservoir and Sunnyside Reservoir seismic upgrade;  Establish a database to summarize the results of the condition assessment of buried water infrastructure to prioritize the rehabilitation and replacement of water mains; and

 Complete the replacement of aging water mains along routes adjacent to Light Rail Transit (LRT).

95 Avenue and 164 Street PRV

the future lives here.

2018-2022 Financial Plan

- 329 -

Made with FlippingBook - Online magazine maker