2018 - 2022 Financial Plan Online Interactive
WATER
HEALTH & WELLNESS
Continue to investigate the chlorine residual in our water distribution
Continue to protect the City’s water quality by conducting cross connection control surveys at 300 industrial, commercial and institutionally zones properties each year.
system and develop a plan to implement any remedial action necessary;
Achieve over 95% compliance of the annual testing of backflow preventers; and
INFRASTRUCTURE
Support Metro Vancouver with their delivery of the Annacis No. 5 river crossing, Kennedy Newton water main, Fleetwood Reservoir and Sunnyside Reservoir seismic upgrade; Establish a database to summarize the results of the condition assessment of buried water infrastructure to prioritize the rehabilitation and replacement of water mains; and
Complete the replacement of aging water mains along routes adjacent to Light Rail Transit (LRT).
95 Avenue and 164 Street PRV
the future lives here.
2018-2022 Financial Plan
- 329 -
Made with FlippingBook - Online magazine maker