• Constructed over 9.6 km of protected cycling network across the City, including segments along 84 Ave, Fraser Hwy, Hwy 99, and also cycling infrastructure on various road improvement projects such as 80 Avenue widening (120 Street to 128 Street), and King George Boulevard MUP north of 40 Avenue.

INFRASTRUCTURE

• Opened 84 Avenue from King George to 140 St, mobilizing over 12,000 vehicles per day; • Constructed arterial widening of 80 Avenue (120 Street to 128 Street) including protected pedestrian and cycling facilities; • Successfully completed the $25 million replacement of the old single-lane Bailey bridge on King George Blvd over the Nicomekl River, in collaboration with the Ministry of Transportation and Infrastructure, on time and on budget; • Delivered 61.4 lane-km of: local (12.7 lane-km), collector (6.2 lane-km), arterial (14.9 lane-km), and MRN (27.6 lane-km) road pavement rehabilitation for $10.78 million; • Completed both phases of early widening works for the Surrey to Langley SkyTrain, and advanced the extension of both Whalley Boulevard and 72 Avenue at Fraser Highway to support growth and detouring during construction; • As part of routine road maintenance, staff have repaired 17,895 potholes, cleared 7,591 catch basins, and placed 143 linear KM of crack seal;

• Utilized Geographic Information Systems (“GIS”) and Computer Vision techniques to complete a pilot to inventory pavement marking assets from aerial imagery; • Initiated a design assignment for the arterial widening of 132 Street (72

Avenue – 80 Avenue) including protected pedestrian and cycling facilities; Successfully secured Bus Rapid Transit from City Centre to South

Surrey along King George Boulevard as TransLink's top priority corridor in the region to advance service planning and infrastructure designs; • Successfully delivered the construction of the King George Boulevard and Nicomekl River Bridge Replacement; • Delivered Year one of the short-term Transportation Priority projects such as the construction of the 80 Avenue road improvements between Scott Road and 128 Street and the design for the 132 Street road improvements between 72 Avenue and 80 Avenue; and • Collaborated with TransLink and Delta to deliver the Scott Road Rapid Bus with service implementation in Q1 2024.