TRANSPORTATION

INFRASTRUCTURE

Begin construction on the Surrey Langley SkyTrain;

• Construct a new road connection onto Fraser Highway from 72 Avenue in support of Surrey Langley Skytrain project; • Work with TransLink on the service planning and infrastructure design for Bus Rapid Transit on King George Boulevard; • Conduct a Critical Road Review to identify the top 20 points of traffic congestion in Surrey with concepts for how to address the issues identified at those locations; and • Continue development of data processes and analytics in support of implementing Sustainable Service Delivery Initiatives.

• Deliver transit priority measures at key points of congestion in Surrey to improve bus speed, reliability and movement of people; Complete Phase 3 of 64 Avenue widening from 177B Street to 184 Street; Twin the 152 Street crossing over Nicomekl River with completion anticipated by Summer 2025 (estimated project value $14.5M), and provide seismic upgrades to the existing crossing by Winter 2025 (estimated project value $1.5M); • Raise and widen 152 Street corridor between 40 Avenue and 5000 block as part of the Disaster Mitigation Adaptation Works; • Start construction of the 20 Avenue Overpass of Highway 99 along with corridor approach improvements; • Construct Phase 3 of 80 Avenue widening from 132 Street to King George Boulevard; • Target an annual lane-km total of 5.2 lane-km for local, 5.4 lane-km for collector, 8.8 lane-km for arterial, and 18.0 lane-km for MRN road pavement rehabilitation; • Continue phased widening of the 32 Avenue corridor between Highway 15 and 188 Street, starting 2024 with the segment between 184 Street to 188 Street (estimated project value $8.5M), and Highway 15 to 184 Street beginning in 2025 (estimated project value $18.5M); • •

City of Surrey | 2024—2028 Financial Plan | Utilities Operating Fund | Transportation

322

Made with FlippingBook - professional solution for displaying marketing and sales documents online