ENGINEERING

INFRASTRUCTURE

• Under the housing accelerator fund, complete the Darts Hill Siphon and 24 Avenue Road & Watermain; • Finalize development of new data driven technology to monitor, analyze and report relevant sustainable service delivery (“SSD”) metrics that will allow the City to better understand

• Develop a GIS roadmap that realigns the City’s digital strategy and establishes a future-ready infrastructure for advanced geospatial capabilities; Continue advancing linear referencing and evaluating utility network systems to support Engineering asset management and required GIS system upgrades; and • Continue supporting the Ministry of Transportation and Transit in the ongoing construction of the Surrey Langley Skytrain Corridor along Fraser Highway. •

infrastructure condition and maintenance or replacement priorities;

Develop an internal application for snow plow tracking; Evolve and enhance sustainable service delivery (“SSD”) and level of service (“LOS”) processes and metrics;

BUILT ENVIRONMENT & NEIGHBOURHOODS

• Continue to collaborate with Metro Vancouver to rezone property to expand the North Surrey Recycling and Waste Centre to include a full scale recycling depot, which will increase convenient disposal options for residents and businesses; • Continue to add BC Hydro five year capital project plan layer to Capital Construction Web Map. This will ensure increased collaboration and reduce potential for conflicting construction plans;

• Advance BC Parkway/key cycling connections around Entertainment District with lighting; • Undertake environmental enhancement work in Bear Creek Park through the construction of a new wetland pond and riparian area enhancements; and • Work with the Province to advance

the 24 Ave/Hwy 99 interchange and advance the design for the project.

City of Surrey | 2026—2030 Financial Plan | General Operating Fund | Engineering