City of Surrey 2017 - 2021 Financial Plan
Sewer
2016 ACCOMPLISHMENTS
BUILT ENVIRONMENT & NEIGHBOURHOODS
Initiated the development of two odour control facilities.
Continued the development of servicing strategies for the Abbey Ridge LAP, Redwood Heights NCP, Newton Town Centre LAP and City Centre NCP; and
ECOSYSTEMS
Continued sewer rehabilitation and cross connection investigation in an effort to reduce the inflow and infiltration (“I&I”) rate by completing the Robson Creek Catchment Rehabilitation and Renewal program study.
Continued to upgrade sewer with capacity constraints to avoid sanitary sewer overflows into environmental sensitive watercourse by completing two sewer relief construction packages; Installed standby generators and
emergency overflow tanks at four pump stations and upgraded one pump station; and
EDUCATION & CULTURE
Participated with Metro Vancouver in outreach programs such as the Grease Reduction Campaign and Unflushables Campaign to reduce the flushing of grease and wipes in the sanitary sewer system.
HEALTH & WELLNESS
Completed various system replacements to address aging infrastructure and reduce the likelihood of basement flooding and sanitary sewer overflows.
INFRASTRUCTURE
Completed design and started 1.5 year-long construction of sewer improvements in Bridgeview.
2017-2021 FINANCIAL PLAN
301
Made with FlippingBook