Financial Annual Report 2016
PERFORMANCE MEASURES
ENGINEERING
Actual Budget 2016 2016 2017 2018 2019 2020 2021
Performance Measures (SustainabilityTheme)
Division
% of Engineering Requirements and Review documents processed within six weeks of referral by Area Planning based on complete and quality submission from applicants’ consultants (Economic Prosperity and Livelihoods)
LAND DEVELOPMENT
36% 50% 50% 55% 60% 70% 75%
Expenses as a % of lease/rental revenues (Infrastructure)
REALTY SERVICES
42% 47% 46% 45% 45% 45% 45%
% reduction in illegal dumping cleanup costs (Built Environments)
42% 40% 50% 50% 50% 50% 50%
Reduce Preventable Employee Injuries by 90% over 5 years (Health & Wellness)
OPERATIONS
0% 60% 70% 80% 90% 90% 90%
Solid waste diversion rate from disposal (Ecosystems)
72% 72% 74% 76% 78% 80% 80%
Length of Drainage Mains Renewed or Replaced (Infrastructure)
4,330 2,000 2,000 2,000 2,000 2,000 2,000
DRAINAGE UTILITY
194
200
220
240
260
300
300
Number of Soil Site Inspections (Infrastructure)
Pay Station reliability—% of time machines operating properly (Infrastructure)
92% 92% 93% 94% 95% 96% 96%
PARKING AUTHORITY UTILITY
Total # of managed parking spaces—time/user restricted and pay parking (Infrastructure)
2,104
2,150 2,250 2,450 2,600 2,700 2,800
Total # of marked pedestrian crossings (Public Safety)
1,020
1,010
1,040 1,070 1,100 1,130 1,150
Streetlight energy savings - LED replacement program (KWh) (Built Environments)
NA
NA 1,168,328 2,336,656 3,504,985 4,673,313 5,841,641
ROADS & TRAFFIC UTILITY
Safer Schools Education and Improvement Program (total #) (Education & Cultural)
29
30
33
36
39
42
45
Total # of kilometers of cycling routes (on-street and off-street) (Built Environments)
565
560
575
590
605
620
635
% of sewer mains video inspected (Built Environments/Infrastructure)
51% 51% 56.2% 55% 63% 66% 69%
SEWER UTILITY
% of sewer manholes inspected (Built Environments/Infrastructure)
12.2% 12.2% 16.2% 19.7% 23.3% 26.6% 29.9%
Kitchen Waste Program total # of residences to date (Ecosystems)
102,700 103,300 104,500 106,000 107,500 109,000 110,500
SOLID WASTE
Solid waste diversion rate from disposal (Ecosystems)
72% 72% 74% 76% 78% 80% 80%
Connected Floor Area (m 2 ) (Build Environments)
69,754 110,000 178,000 245,000 314,000 411,000 525,000
SURREY CITY ENERGY UTILITY
Ratio of hours in service to total hours since operating commenced (Build Environments)
100% 100% 100% 100% 100% 100% 100%
% of single family homes on water meters (Built Environments)
72% 70% 72% 74% 75% 76% 77%
WATER UTILITY
Average winter residential water consumption (litres per capita per day) (Built Environments)
257
265
263
261
259
257
255
27
Made with FlippingBook Annual report