2026 - 2030 Surrey Financial Plan

WATER

2025 ACCOMPLISHMENTS

HEALTH & WELLNESS

Achieved over 75% compliance of the annual testing of backflow preventers; Maintained overall water quality in the system through annual unidirectional flushing program where approximately 300 km of mains, 13% of the whole system, were flushed;

Commenced the cross connection survey at industrial, commercial, institutional and multi-family lots within City Center; and Monitored water quality at City pump stations and 51 sampling

stations to ensure residents receive safe drinking water.

INFRASTRUCTURE

Replaced 2.1km of obsolete watermain within City Centre, Newton, Clayton and South Surrey to maintain service reliability; Maintained a watermain break rate of fewer than 2 breaks/100km, which is lower than the average for municipalities across Canada; and Completed the replacement of four Pressure Reducing Valves (“PRV”) in the City with an above ground kiosk to eliminate confined space entry.

Watermain drainage pipe construction in South Surrey

City of Surrey | 2026—2030 Financial Plan | Utilities Operating Fund | Water