City of Surrey's 2021 - 2025 Financial Plan

WATER

2020 ACCOMPLISHMENTS

HEALTH & WELLNESS

• Achieved over 85% compliance of the annual testing of backflow preventers; and •

Monitor the water quality at all City’s pump stations to ensure our residents receive safe drinking water.

INFRASTRUCTURE

• Complete the upgrade of Sunnyside Pump Station #1, and commence the construction of Pump Station #2; • Update Design Criteria Manual to include the latest seismic design criteria and vulnerability map; • Update Meter and Service Connection Design Criteria to include meter and service connection sizing methodology;

• Complete the preliminary design of Newton Pump Station; • Initiate the condition assessment of concrete main on 128 St using electromagnetic technology to detect location of broken reinforcing wires and corrosion of metallic wall; and • Expanded the City’s current voluntary meter installation program by 26% compared to the previous year .

EDUCATION & CULTURE

• Completed a water conservation program for junior and high school students to educate them on the importance of water conservation and the role they can play in advancing water conservation.

City of Surrey | 2021—2025 Financial Plan | Utilities Operating Fund | Water

357

Made with FlippingBook - professional solution for displaying marketing and sales documents online